- Design & Engineering
- Project & Construction Management
- Consultancy
CRA foster in their staff a positive attitude that reflects professionalism, integrity, dedication and inspiration.
Micro Hydro is a source of renewable energy and environmentally friendly which has the potential to replace fossil fuels.This has encouraged client to conduct a feasibility study the development of micro hydro power plant located in Melong, Subang.
CRA is requested to assess ambient temperature of the existing warehouse. Temperature at storage area is currently ranged in between 36 – 39 oC for 1st and Mezzanine floors. This assessment will give the correct HVAC system recommended for DHL warehouse
Hydropower potential in the study area is relatively abundant, especially for the construction of minihydro which is estimated capacity at 2.4 MW. This potential can be developed into a source of electrical energy around the study area.
Detail Design (Civil) WWTP Capacity 300 m3/day with building facilieties : Aerob and Andaerob Tank, Equalization Tank, Clarifier, Panel Room. located in Majalengka, West Java.
CRA foster in their staff a positive attitude that reflects professionalism, integrity, dedication and inspiration.