Wednesday, December 9, 2020

Energy Project Portfolio

 



  • Client     : PT. Rekayasa Teknik Perkasa
  • Year       : 2020
  • Scope    : Feasibility Study, Detail Engineering Design, Site Supervision during    construction of   Mini Hydro Power Plant 2.4 MW
  • Location : Kiarasari Village, Kec. Cigudeg, Kabupaten Bogor, West Java

  • Client             : PT. Cleantech Solar Indonesia
  • Name Project : Structural Assessment of Factory Building at PT Elang Perdana Tyre
  • Year               : January 2021
  • Location         : Jakarta
  • Scope            : Structural Analysis, Asessment & Structural Strengthening

  • Client             : PT. Cleantech Solar Indonesia
  • Name Project : Structural Assessment of the Building Roof of Cargill – Cikande (Banten) for Solar Panel Installation.
  • Year              : September 2021
  • Scope            : Structural Analysis,  Asessment & Structural Strengthening
  • Location         : Banten – Jawa Barat

  • Client             : PT. Cleantech Solar Indonesia
  • Name Project : Structural Assessment of the Building Roof of CS2 Project Site-2 Pandaan – East Java for Solar Panel Installation.
  • Year              : September 2021
  • Scope            : Structural Analysis, Asessment & Structural Strengthening
  • Location         : Jawa Timur

  • Client             : PT. Cleantech Solar Indonesia
  • Name Project : Structural Assessment of the Building Roof of CS2 Project Site-1 Ciawi – Bogor for Solar Panel Installation.
  • Year              : September 2021
  • Scope            : Structural Analysis, Asessment & Structural Strengthening
  • Location         : Bogor – Jawa Barat